The short answer: Get the machine’s real weight, dimensions and center of gravity, measure every door, floor and turn between the old spot and the new one, and decide in writing who disconnects, moves, sets and reconnects the machine. Have the machine shut down, isolated, drained and labeled before the riggers arrive. If the machine […]